Adobe Experience Manager RFP Template
Adobe Experience Manager RFP, ready to edit
Free PDF. What each section contains .
Before You Issue a Adobe Experience Manager RFP
AEM RFPs need one early architectural decision made explicit: how much of the experience will be built from configurable, reusable components versus custom development. That single ratio drives cost, timeline and every future upgrade, and vendors will assume whatever flatters their bid unless you pin it down. Ask for the assumption in writing, with the component inventory the estimate is based on.
Content migration deserves its own workstream and its own acceptance criteria. Automated migration tooling is genuinely good now, but only when someone has first decided what should not migrate — most legacy sites carry years of pages nobody will ever request again. A partner that proposes migrating everything has not thought about it.
Finally, score the authoring experience, not just the rendered site. Demand a demo of the actual authoring workflow your marketing team will use — template creation, page assembly, publication — because that is where AEM projects earn or lose their return.
What the Adobe Experience Manager Sections Cover
- Component inventory, and which ones extend core components
- Editable templates and the authoring freedom they leave
- Page and asset counts the migration estimate rests on
- Content freeze window and who runs the cutover
- Dispatcher, CDN and Cloud Manager pipeline ownership
- Author training measured on your own templates
Writing the Adobe Experience Manager Scope of Work
Anchor the scope to a page-type and component inventory rather than to a page count. AEM effort scales with the number of distinct templates and components you need, not with how many pages use them, and a site with four hundred pages built from twelve templates is far cheaper than one with eighty pages that are all bespoke. Attach whatever inventory you have, even a rough one, and state the assumption you want vendors to price against: how many editable templates, how many components, and what proportion may be adapted from the core component set rather than written from scratch.
Be explicit about the delivery model, because AEM as a Cloud Service, Adobe Managed Services and on-premise implementations differ in what the vendor can even touch. On Cloud Service, say whether Cloud Manager pipelines, environment provisioning and the dispatcher configuration are in scope or already owned internally, and who holds the deployment approval. State whether custom code must pass the build quality gates, and who fixes it when it does not. If you are on an older version and this engagement includes the upgrade, treat the upgrade as its own workstream with its own acceptance, not as a preamble to the build.
Multi-site structure is where AEM scopes quietly double. If you operate several brands, countries or languages, the scope must say whether you need a live copy structure with language copies and translation integration, how many locales launch in phase one, and whether the translation vendor connector is in or out. Blueprint and rollout configuration is a design decision with permanent consequences for how much local teams may override, and vendors will assume the simplest possible arrangement unless you say otherwise. Say who owns the authoring model for markets that join later.
Put integrations and content operations on the out-of-scope list unless you deliberately fund them. Search, personalization, analytics instrumentation, form handling, commerce data and customer account areas all commonly arrive as assumptions. Name each one and assign an owner. Then define done in terms of the authoring outcome as well as the rendered outcome: an author can build a named set of page types unaided from documented templates, the site meets stated performance and accessibility targets in production configuration, and the dispatcher and cache invalidation behavior is documented rather than tribal knowledge.
Requirements That Actually Separate Adobe Experience Manager Proposals
- Component reuse evidence — ask the vendor to show, for a comparable build, the split between core components used as shipped, core components extended, and fully bespoke components, and to explain what drove anything into the bespoke column.
- Authoring ergonomics — require a demonstration of the authoring dialogs your marketers will actually use, including how a complex page is assembled, because dialog design determines whether your team publishes independently or files tickets.
- Upgrade resilience — ask how the vendor keeps customisations compatible with continuous Cloud Service releases, specifically which extension points they avoid and what they do when Adobe deprecates something their code depends on.
- Dispatcher and cache invalidation design — require the caching strategy in writing, including how personalized or authenticated content is handled and what invalidates on publish, since this is where performance and stale-content incidents originate.
- Translation workflow — if you run multiple locales, require a description of the rollout and translation configuration, including how a local market makes a permitted override without breaking inheritance from the blueprint.
- Headless boundary — state whether content fragments must serve other channels, and require a position on which content is authored as fragments for reuse versus authored in page context, because retrofitting that split later is expensive.
- Performance acceptance — require field performance targets measured on the production configuration with real images and third-party scripts present, not on a clean staging environment with the tag manager disabled.
Common Mistakes in Adobe Experience Manager RFPs
- Leaving the custom-vs-configurable component ratio unstated, making every proposal's estimate incomparable.
- Migrating the full legacy content inventory instead of running a keep/kill/rewrite audit first.
- No Core Web Vitals or dispatcher-caching targets in the requirements, discovered only at launch review.
- Evaluating the rendered site while ignoring the authoring experience the marketing team lives in daily.
- Assuming AEM as a Cloud Service behaves like AMS — upgrade cadence and customization constraints differ materially.
- Pricing the build against a design system that does not exist yet, so every component is estimated twice: once against the assumption of clean specifications and again when the design decisions arrive mid-build.
- Treating search as a configuration detail when your requirements imply faceted, multi-locale search across content types, which is a distinct engineering workstream with its own indexing and relevance tuning.
- Scoping a single production environment path without stating how many authoring environments, preview flows and release trains the organization actually needs, then discovering deployment contention between brands.
- Requiring a fully accessible site in the requirements but only testing the rendered front end, leaving the authoring interface and generated markup patterns untested against the same standard.
Questions Worth Asking Adobe Experience Manager Vendors
- What component library do you start from, and what share of the last three builds was custom code versus configuration?
- How do you run content migration — tooling, enrichment, and the criteria for what does not get migrated?
- Show Cloud Manager pipeline and dispatcher configurations from a delivered project and explain your caching strategy.
- How do you keep customizations compatible with AEM as a Cloud Service's continuous upgrade model?
- Which authors on real projects have you trained, and what did the first-90-days adoption support include?
How to Weight the Adobe Experience Manager Evaluation
Weight the authoring experience heavily, more heavily than most buyers instinctively do. The rendered site is visible to everyone in the evaluation and the authoring interface is visible to nobody until after signature, which is exactly why it gets neglected. Yet the return on an AEM license comes from marketing teams building and changing pages without engineering involvement, and that depends entirely on how the templates and dialogs were designed. Ask to see it, and let what you see move your scores.
Score architectural restraint above breadth of capability. Almost any competent AEM partner can build what you describe; the difference between proposals is how much custom code they will leave behind and how much of it your future upgrades will have to carry. A proposal that argues for fewer, more configurable components, even where that means telling you a requested design variation is not worth its maintenance cost, is usually the cheaper option over five years.
Give migration and content operations real weight rather than treating them as a supporting workstream. On most AEM programs the build finishes roughly on time and the content readiness does not, because writing, reviewing and restructuring content is a client-side effort that nobody sized. A vendor who insists on quantifying that effort during the proposal, and who proposes a governance model for it, is telling you something useful about how their projects actually run.